How to get DCD Inspection and Completion Certificate? | Dubai Approvals Blog

How to get DCD Inspection and Completion Certificate?

Dubai Approvals

May 24, 2022

Are you having a hard time acquiring DCD approval for your construction projects in Dubai? You might be overlooking some essential details and requirements to gain Dubai Civil Defence approval. We sum up the most important details of how to get DCD Inspection and approvals for easy and convenient information access.

Importance of Dubai Civil Defence Inspection and Completion Certificate

The vision of the Dubai Civil Defence has always stood firm “To have the United Arab Emirates as one of the best countries in the world in achieving Safety and Security”. With the objective to protect lives by providing safety and security to all industrial, commercial, residential, and public establishments in the Emirate. Acquisition of DCD Inspection and Completion Certificate are both important to assure that the vision of the government authority of Safety and Security is firmly established and followed. DCD Inspection requirements and processes are set accordingly on the e-services portal for a simple and hassle-free procedure.

Licenses for any construction activities are only issued through the Development Department of the Dubai Civil Defence by providing credentials to qualified engineers and fire safety and first aid officers who have taken and passed the relevant examinations, courses, and training. Most building projects in Dubai require DCD Inspections to certify compliance with the safety standards and regulations. The Completion Certificate will then be released by the authority after compliance is assured.

DCD Inspection Requirements

From Main Contractor

  1. Fitout Permit
  2. DCD Approved Drawing
  3. DCD Final Approval
  4. Copy of Contractor Trade License
  5. Copy of DCD Fire Code Invoice
  6. Copy of P.R.O Card or Delegate Card
  7. 6-page Application typed in the Arabic Language
  8. Green File

From Fire Fighting Contractor

  1. Copy of Building valid Annual Maintenance Contract
  2. Equipment Supply and Installation Certificate for Smoke Detector and Heat Detector; Emergency and Exit Lights, Fire Sprinkler 
  3. Equipment Warranty Certificate for Smoke Detector and Heat Detector; Emergency and Exit Lights, Fire Sprinkler
  4. Commissioning Report for Fire Sprinkler 
  5. Testing and Commissioning Report for Fire Alarm 
  6. Cable Certificate
  7. Warranty Certificate
  8. Fire Alarm Interface Connection Certificate for newly installed addressable Fire Alarm Control Panel.
  9. Fire-rated Parquet Flooring Certificate for wooden parquet flooring works.
  10. Fire Alarm Control Panel Documents
  11. 24/7 Payment Receipt

Requirement for Final Completion Certificate

  1. A copy of the valid construction license issued by the concerned authority.
  2. Valid certificates of Importing, Installation, and Testing of a guaranteed Fire and Alarm System by an approved Installation and Maintenance Company. 
  3. Undertaking the Certificate for Maintaining Fire Equipment by the owner and the Certificate for Installing Fire-rated Doors and Cables.
  4. Copy of the Trade License and Maintenance Contract of Fire equipment and systems, besides the road map of the premises, and an official letter showing the contact number of the concerned person during 24 hours.

Requirements for Certificate of Completion for Building

From Main Contractor

  1. Building Permit for Building
  2. Approved Drawing
  3. Certificates for Supply, Installation, and Warranty of all DCD Fire and Life Safety Equipment as per the DCD Approved Design Drawings.
  4. Smart Monitoring Subscription Certificate for Building
  5. Dry Riser or Wet Riser Certificate
  6. Elevator Inspection and Elevator Manufacturer Certificate
  7. Certificates from Contractors for all Fire and Life Safety Equipment interfaced with building Fire Detection and Alarm System

Requirements for Certificate of Completion for Decor or Fitout Projects

From Main Contractor

  1. Building Permit for Decor
  2. Approved Drawing 
  3. Certificates for Supply, Installation, and Warranty of all DCD Fire and Life Safety Equipment as per the DCD Approved Design Drawings.
  4. Certificates from Contractors for all Fire and Life Safety Equipment interfaced with building Fire Detection and Alarm System
  5. Smart Monitoring Subscription Certificate 
  6. Maintenance contract for the Fire and Life Safety systems of the building or building completion.

Requirements for Certificate of Completion for  LPG/ Fuel Gas Installation

From Main Contractor

  1. License for the LPG or Fuel gas company approved by DCD
  2. Approved Drawing
  3. Certificates for Supply, Installation and Warranty for all LPG equipment as per the DCD-approved design drawings
  4. DCD completion certificate for Decor or Fitout or building Fire and Life Safety system maintenance contract
  5. Annual Maintenance Contract for LPG or Fuel gas system
  6. Certificates for all LPG equipment and control panel interface with building Fire Detection and Alarm System

Dubai Approvals Team ensures the compliance of safety standards of construction projects in Dubai for accurate DCD Inspection approval to swiftly acquire Completion Certificate. Our team offers excellent services on document submission, drawing approvals, acquisition of NOCs, and inspections are the key to helping our clients achieve quality and successful projects. We are looking forward to working with you, contact us for more DCD Approvals service details.
 


RELATED BLOG

Why people love us

Chat on Whatsapp chat on whatsapp