A high standard of healthcare is essential for everyone. Dubai Approvals Team will take care of everything on behalf of you and get you a DHA Approval quickly.
As the population is increasing day by day, the demand for medical practitioners is also getting a hike. The fastest-growing economy Dubai has a high demand for qualified working professionals. With its advanced culture and working environment, the city every year welcome many doctors, nurses, and medical interns to advance their career in the health industry.
Although, there are some essential guidelines under DHA Approval that one has to follow in order to get a license to practice medicine in the United Arab Emirates. The United Arab Emirates is different from other countries as there isn’t one single license for all types of healthcare professionals. There are four different licenses; MOH, DHCC, DHA, HAAD. The license is valid during their clinical practice and must be related to the concerned field of the Dubai Healthcare Authority or DHA.
The DHA (Dubai Health Authority) has authority over licensing in the mainland of Dubai. It includes basically all territory of Dubai except Dubai Healthcare City free zone. DHA is a health regulator as he owns and operates four government hospitals in Dubai.
Getting DHA approval in Dubai:
To work in the mainland of Dubai as a healthcare professional you need a DHA license. Getting healthcare approval in Dubai is not easy unless you contact the right license approval authorities. You need to go through huge paper work and presentation of accurate documents. A well-established company in this field can unload your approval burden.
Healthcare professional can apply for two types of DHA licensure:
Full license
Provisional license: those who do not fulfill the requirement of the full license can opt for provisional license where they will work under the supervision of the specialist or consultants
The DHA issues license to doctors in three categories
General practitioners
Specialists
Consultants
Getting started with the clinic:
Getting a DHA license is one of the steps in the procedure that start with registration of trade name: for this online application and submit to the Department of Economic Development (DED). To get approval from the DED take the following things into consideration:
NOC from the owner to assign Medical Director
A building contract
List of healthcare professionals who are going to work in your clinic.
A valid passport copy. The visa requirement for entering Dubai can change without warning, so it is advised to keep yourself up to date with the latest provided information.
Understanding the process of DHA approval in Dubai:
UAE has a highly developed healthcare infrastructure. Modern medical facility offers a high standard of care both in government and private sectors.
The purpose of DHA approval in Dubai is to ensure the safe delivery of high standard healthcare services to the citizen of the country.
The DHA approval in Dubai is a step-wise process that entirely goes online. On average, the approval takes 2 months but in some cases, the process can go by up to 1 year. The overall cost, if you take care of every step that comes to your pocket is about AED 5000. You can go through the whole process by yourself or you can hire a company to ease your work.
Initial requirements:
Layout your plan before the concerned authority.
Don’t forget to attach the affection plan from the Dubai Municipality and a copy of the trade name reservation letter from the DED.
Dubai Municipality approval for your playout plan is also necessary to get the desired approval from the said department.
Proposal letters from the partners if any.
Correct submission of papers.
This is the foremost thing you need to keep in mind while applying for DHA approval in Dubai. Be familiar with the licensing process before setting up your clinic in Dubai is very important. Find a service provider to smooth going of the procedure.
As an owner of the clinic, you need to provide a complete list of medical professionals and consultants who will be working in your hospital.
The work of DHA approval in Dubai is to examine each document carefully and verify the same with its underlined procedure.
A medical fitness will also be conducted if the applicant's age is 65 and above if any of your given applicants falls in this category.
Once the process is complete, you can get your DHA Approval in Dubai and start your clinic.
May 4, 2019
Before commencing any work related to the planning and construction of a project under the Dubai Municipality or DM jurisdiction, it is important to first acquire approvals from the Dubai Municipality. DM Dubai provides various approvals for individual, commercial, and Government services, i.e., individuals, businesses, as well as Government bodies need to acquire a permit or approval before commencing any project work in Dubai. So, let’s discuss some of the approvals provided by DM and what procedure it requires for you to get a DM approval.
The building department of DM provides approvals for new buildings. Any individual, business, or Government body with a proposed building plan can avail of this service and get DM approvals for their project. The approval can be acquired for either a Structural plan, or Architectural Plan, or both. The various types of projects that are covered under this service include single and multi-story buildings, industrial structures, villas, and floor ratio area. Before commencing any physical on-site, it is important to get the primary DM approval in order to make sure the project work is as per the standards and guidelines of Dubai Municipality, otherwise, no physical work should be started. However, Dubai Municipality does not require you to get a primary approval, instead, you can directly apply for the final approval.
In order to make sure you get the approval easily, you must follow the given procedure:
This service is provided by the Survey Department of DM and provides various sub-services like Land Boundary information, zoning regulations, approved number of floors, use of land, land area, setback area, owner of the title, etc. The most important benefit of this service is that it does not take any long duration of time, i.e., in case of renewal of villas, you can get the approval within 15 minutes, and the rest of the services take only 1 working day.
In order to ensure a smooth procedure for this approval, follow the given instruction:
There are several other approvals provided by Dubai Municipality authority which can be availed from the official website of DM or various DM approved offline centers. The Dubai Municipality approvals process can be very easy but understanding the nature of your project and then submitting the application for the service can be very complex. If you are also looking forward to getting DM Approval, then do not worry and leave all the difficulties and complexities to us. Our experts at Dubai Approvals Team will help you step by step so that you can get your Dubai Approvals on time without any hassle.
We also help you for getting approvals from various other authorities like Trakhees, DEWA, NAKHEEL, DSO, JAFZA, Food Control Department, EMAAR, RTA, TECOM and DCCA, and Warehouse approvals. So, Contact Us, save your precious time, and start working on your dreams right away.
May 4, 2019
The Dubai Municipality has come a long way since its establishment on February 28th, 1957 by the first decree. It provides Dubai Municipal Approval and other services to the population of Dubai and its work includes urban planning, construction supervision, environmental protection and improvement, public parks conservation, regulating and ensuring international quality standards compliance in aspects such as
Having begun with just 3 operating employees, it has grown into an organization having more than 15,000 staff working in 32 organizational units, making it a major driving force in the development of Dubai City. With a vision of “Developing a happy and sustainable city,” the Dubai Municipality Approvals or DM Approval is also instrumental in maintaining the architectural heritage of the emirate by revival and maintenance of many cultural landmarks.
The services offered by these sectors are segregated into individual, government, and business-centric, with the focus of DM Approval quality control on areas such as: Environment and waste, Financial and business, building and land planning, lab testing and accreditation, Public health and consumer safety, drainage and irrigation, veterinary, agriculture and public markets services.
The Dubai Municipality or DM has a planning division that allows streamlined submissions to be made from the user end and a legislative system in place to demarcate its jurisdiction. One example of planning assistance is guidelines for submission of Masterplan for building plan proposals. Here, the applier submits a draft proposal for preliminary assessment that covers ownership, on-site and surrounding region description. Following this, a final assessment submission requires Non-Objection Certificates from the concerned local authorities (Dubai Police, Civil aviation, Road transport authority, Dubai Electricity and water authority, etc.) Finally, the DM Approval provides a “sign off sheet” to all service authorities for their approval of the master plan.
After completing all these procedures, a follow-up application needs to be filed online at www.dm.gov.ae which consists of paying the application fee as well. A tutorial to filing this online application is available here.
The year 2011 was a dramatic one for the DM. This was primarily due to the disconnection of utility services to many residential, industrial and commercial buildings as a result of illegal modifications, partitions, and additions that were made. Warning notices were first sent following which heavy fines were levied to discourage non-compliance. Repeated offenses meant that utility services to the offenders were cut through the Dubai Electricity and Water Authority (DEWA). Sometimes unauthorized changes to buildings also run the risk of lack of fire exits or basic health requirements and ambiance quality like lighting and ventilation. Once the corrective action was taken, the services were restored to these locations.
If you are looking for Dubai Municipality Approvals, you can Contact Us.
Also, read Dubai Municipality (DM) approval in Dubai.
May 4, 2019
Established in 1954 by Rashid Bin Saeed Al Maktoum, the then crown prince, Dubai Municipality or DM looks after all the facilities provided to the people of Dubai by the Dubai government. It has jurisdiction over all the city services and provides a tremendous amount of online services to residents as well as government sectors of Dubai. In 2001, Dubai Municipality Approval started its online service portal, wherein 40 city services were provided online in its initial phase. Today, almost all the services provided by the Dubai Municipality Approval or DM Approval can be accessed online. Being a resident of Dubai, or a businessman, it might be necessary for you to avail certain services every now and then. But the question that arises is what type of services can you actually avail of depending on your requirement and category.
Dubai Municipality Approval or DM Approval provides various services to businesses, individuals, as well as to government sectors. In order to make it easy for you to understand, let’s list down all the services available to individuals and business sectors:
Individual Services
These are the DM Approval services provided to residents of Dubai, be it citizens or visitors include:
Business Services
These DM Approval services are provided to businesses in Dubai.
If you are looking forward to avail any of these Dubai Approvals services, our experts will help you throughout all the steps and will guide you so that you obtain any type of DM Approvals quickly and hassle-free.
Read also: Procedure for Various Licensing Approvals of Trakhees
May 18, 2023
As the vibrant city of Dubai continues to grow and develop, the need for efficient and reliable infrastructure becomes paramount. From towering skyscrapers to intricate road networks, every construction project in Dubai requires thorough planning, meticulous design, and proper approvals from the relevant authorities. This is where engineering consultants play a vital role in ensuring that projects comply with regulations and obtain necessary approvals.
Engineering consultants are professionals who possess the knowledge, expertise, and experience in various engineering disciplines. They provide valuable guidance and support throughout the entire project lifecycle, from initial design to final construction. When it comes to Dubai authority approvals, engineering consultants serve as the bridge between the project stakeholders and the regulatory bodies, facilitating a smooth and efficient process.
One of the primary responsibilities of engineering firms in Dubai is to navigate the complex regulatory landscape and ensure compliance with the guidelines set forth by the relevant authorities. These authorities include Dubai Municipality, Dubai Civil Defense, Dubai Electricity and Water Authority (DEWA), and other specialized entities depending on the nature of the project. The consulting firms possess a deep understanding of the local regulations, codes, and standards, enabling them to design projects that meet the stringent requirements of these authorities.
One of the key areas where building consultants play a crucial role is in obtaining necessary approvals and permits from the Dubai authorities. This process can be challenging and time-consuming for project owners who may not have the expertise or knowledge to navigate the intricate procedures. Engineering consultants act as the project's advocate, liaising with the authorities, submitting the required documents, and ensuring that all necessary permits are obtained in a timely manner. This saves project owners significant time and effort, allowing them to focus on other aspects of their business.
Furthermore, engineering consultants in UAE provide invaluable support in the preparation of design documents and technical drawings that are required for Dubai authority approvals. They have a keen eye for detail and ensure that all design aspects are thoroughly documented and meet the standards set by the authorities. This includes architectural, structural, mechanical, electrical, and plumbing designs, among others. By working closely with the project team, engineering consultants ensure that all designs are accurate, comprehensive, and compliant, thereby increasing the chances of obtaining approvals without delays or rejections.
Another critical role of engineering companies in Dubai authority approvals is their expertise in conducting feasibility studies and impact assessments. Before embarking on any construction project, it is essential to assess the potential impact on the environment, infrastructure, and surrounding communities. Engineering consultants analyze various factors such as traffic flow, environmental sustainability, and structural integrity to determine the feasibility of the project. They provide valuable insights and recommendations to ensure that the project aligns with Dubai's vision for sustainable and responsible development.
Additionally, consultants assist in risk assessment and mitigation strategies. They identify potential risks associated with the project, such as geological hazards, fire safety concerns, or structural vulnerabilities, and develop comprehensive risk management plans. By addressing these risks proactively, engineering consultants help ensure the safety of the project, its occupants, and the surrounding environment.
Moreover, Building consultants in Dubai often collaborate with other professionals, such as architects, contractors, and project managers, to streamline the approval process. They act as a central point of contact, coordinating efforts between various stakeholders and authorities. This collaborative approach fosters effective communication, eliminates misunderstandings, and expedites the approval process.
Engineering consultants play a vital role in Dubai authority approvals for construction projects. Their expertise in navigating the regulatory landscape, ensuring compliance, and obtaining necessary permits is invaluable to project owners. By leveraging their knowledge and experience, engineering consultants save time, minimize risks, and enhance the chances of obtaining approvals without delays or rejections. As Dubai continues to evolve, the importance of engineering companies in facilitating the development of sustainable and innovative infrastructure cannot be overstated.
May 4, 2019
The Dubai Municipality or DM has come a long way since its establishment on February 28th, 1957 by the first decree. It provides municipal services to the population of Dubai and its work includes urban planning, construction supervision, environmental protection and improvement, public parks conservation, regulating and ensuring international quality standards compliance in aspects such as
DM, having begun with just 3 operating employees, has grown into an organization having more than 15,000 staff working in 32 organizational units, making it a major driving force in the development of Dubai City. With a vision of “Developing a happy and sustainable city” the Dubai Municipality is also instrumental in maintaining the architectural heritage of the emirate by revival and maintenance of many cultural landmarks.
The DM Dubai is currently composed of 34 departments under six sectors, namely:
The services offered by these sectors are segregated into individual, government, and business-centric, with the focus of DM Dubai quality control on areas such as Environment and waste, Financial and business, building and land planning, lab testing and accreditation, Public health and consumer safety, drainage and irrigation, veterinary, agriculture and public markets services.
An example of planning assistance by DM
The DM Dubai has a planning division that allows streamlined submissions to be made from the user end and a legislative system in place to demarcate its jurisdiction to acquire the Dubai Municipality Approval. One example of planning assistance is guidelines for the submission of a Master plan for building plan proposals. Here, the applicant submits a draft proposal for preliminary assessment that covers ownership, on-site, and surrounding region description. Following this, a final assessment submission requires Non-Objection Certificates from the concerned local authorities (Dubai Police, Civil aviation, Road transport authority, Dubai Electricity, water authority, etc.) Finally, the DM provides a “sign-off sheet” to all service authorities to get Dubai Municipality Approval for their master plan.
After completing all these procedures, a follow-up application needs to be filed online at the Dubai Municipality which consists of paying the application fee as well.
Non-Compliance crackdowns – Serious Quality Assurance
The year 2011 was a dramatic one for the DM. This was primarily due to the disconnection of utility services to many residential, industrial, and commercial buildings as a result of illegal modifications, partitions, and additions that were made. Warning notices were first sent following which heavy fines were levied to discourage non-compliance. Repeated offenses meant that utility services to the offenders were cut through the Dubai Electricity and Water Authority - DEWA. Sometimes unauthorized changes to buildings also run the risk of a lack of fire exits or basic health requirements and ambiance quality like lighting and ventilation. Once corrective action was taken, the services were restored to these locations.
Also, read Some Facts about Dubai Municipality (DM)
May 4, 2019
Ask any person around you ‘where can a place with all the luxury and ultra-modern infrastructure be found?’ The answer will surely be ‘Dubai’. Isn’t it amazing to witness everything full of life when you take a peek at your surroundings? Obviously, it is!!! And the best part is that you can be a part of this experience. It can be regarded as a human psychology that once you experience something you feel is out of this world, you automatically go into a state of awe, and you start to complement the beauty.
But the matter of fact is that no one tries to compliment the efforts behind making that place worth watching. For instance, Burj Khalifa amazes everyone with the whopping height it is standing at, but no one compliments the efforts of various public bodies and authorities who worked day and night to make the project possible. One of the authorities is the Dubai Electricity and Water Authority – DEWA, which is committed to making Dubai a place full of energy and fun. Let’s take a look at how DEWA has been, and is, committed to making Dubai a place to live in luxury.
With time, Dubai is emerging as one of the best markets in the world. If you are looking to invest and set up your own projects, then Dubai should be your first option. So don’t waste your time any further and start your dream project in Dubai – The Dream World. You just need to get some approvals from various authorities in Dubai. Dubai Approvals will make it even easier for your DEWA Application. Our team will help you with a step-by-step process so that you can get DEWA Approvals for your projects in a short span of time and give wings to your vision.
March 1, 2022
Dubai Electricity and Water Authority - DEWA provides the essential supply of electricity and water to customers across the emirate of Dubai. The authority endeavors to provide the highest quality customer services with reliable, clean, and safe electricity and water utilities. DEWA applications for getting electricity and water services can be submitted through the authority’s E-Services system. Dubai Approvals Team helps clients with the document and drawing completion, application, and approval acquisition for different various construction projects.
DEWA Completion Certificate and As-Built Approval are needed for the final clearance of proposed projects prior to starting any construction work. The requirements needed for the application such as technical documents and drawings included in the list below must be submitted and will be technically reviewed for approval. Preparation of an estimate on connection charges will then be further processed by the authority for field inspection and other relevant services needed. These estimates and charges will be subjected to payment subsequently, field works and inspections from the authority’s side will be carried out.
The Completion Certificate for the Final Clearance and As-Built Approval submission requirements include the following below:
1. Cover Letter addressed to the Senior Manager from Infrastructure Information & Permits Department.
2. Copy of DEWA ED approved As-Built drawing in PDF Format - For Completion Certificate Application.
3. Full set of DEWA ED approved shop drawing with NOC for ED -Ducts and/or Cable Diversions along with NOC letter in PDF Format.
4. Full set of DEWA WD approved shop drawing NOC for Water Network Diversions and/or protection works along with the NOC letter as per the scope of work in PDF Format - For Completion Certificate Application
5. Full set of DEWA ED & WD construction NOC along with NOC letter in PDF Format
6. Key plan indicating the full project area - For Completion Certificate Application.
7. Project As-Built Drawing integrating DEWA services approved by project consultants & contractors are as follows:
8. The following is to be provided whichever is applicable:
9. Material Reconciliation Statement - MRS as per DEWA standard format for cable and Betterment ducts in PDF Format, along with the following documents for Completion Certificate Application.
10. Final Duct summary details for DEWA ED Betterment Work only as per DEWA standard format signed and stamped by project consultants and contractors in PDF Format.
11. DEWA Approval letter of material if procured from outside.
12. Copy of DEWA ED Approved BOQ for Betterment Work, applicable to RTA Projects.
13. Final actual Cost BOQ for DEWA ED betterment work acknowledged by RTA, applicable to RTA Projects for Completion Certificate Application.
14. Duct and Duct Marker inspection record signed by DEWA ED representative for the future proposed spare, split, and extension Ducts.
15. CSV files in accordance with DEWA digital submission standard.
16. DEWA Water Department checklist clearance acknowledged by DEWA Water Project, for Completion Certificate Application.
17. Cable backfilling checklist for 6.6KV, 11KV & 33KV slewing, raising, and lowering work, if Applicable.
Clients can track the status of the application, upload and submit additional documents, download the approved documents, project status notifications for technical inspection, and many more through the E-service one window system. Our team understands how necessary DEWA Application on Completion Certificate for the Final Clearance and As-Built Approval to projects, hence we provide the right and accurate support for the acquisition of approvals.
April 2, 2022
Indeed, Dubai has a lot to offer, starting from its luxury malls, breathtaking tourist spots, one-of-a-kind structures, beautiful multicultural people, unending career opportunities, and many more to mention. Its remarkable economic growth drives more business ventures that evidently magnet more construction opportunities all around the city. This means more projects on the line for authority approval services which include the acquisition of permits prior to construction works. Permit provisions may vary on each project's scope, purpose, and compliance with the regulations imposed by the appropriate authorities such as DDA. If you are an investor wanting to start a venture in Dubai or an entity looking forward to developing properties in the city by building or modifying structures for residential, commercial, or industrial purposes, here are the required permits you might need to acquire.
Note that a land Demarcation Certificate is required to be obtained before starting any activity at the site.
The approved permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment letter duly signed by the owner, consultant, and/or the contractor
Fees
Normal Submission
Total Built-Up-Area requires AED 1.00 per square foot with a minimum of AED 200.
Final Building Permit fees will be calculated after deducing the fees which were paid previously for the Interim & Preliminary Permit excluding the Mobilization and Excavation Permits.
Industrial Use
Fees are not to exceed AED 250,000.
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 2 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit. The approved Mobilization Permit is valid for 6 months.
Required Documents
Building Permit Application
Appointment letter duly signed by the owner, consultant, and/or the contractor
Fees
Mobilization Permit requires AED 5,000
Mobilization for Villas requires AED 1,000 per Villa
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 2 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit. The approved Excavation Permit is valid for 6 months.
Required Documents
Building Permit Application
Appointment letter duly signed by the owner, consultant, and/or the contractor
Geotechnical design calculations of slope stability for open Excavation
Geotechnical Model - software designed
Excavation Design Drawings as per Circular No.400
No Objection Certificates from relevant authorities
Excavation Design Review Checklist
No Objection Certificates from the neighbor or plot owner if the excavation is within the neighbor's plot
Fees
An excavation Permit requires AED 5,000
Excavation Permit for Villas requires AED 1,000 per Villa
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 3 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit. The approved Shoring Permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment Letter duly signed by the owner, consultant, and/or the contractor
Geotechnical Design Calculations
Geotechnical Model - software design
Shoring Design Drawings as per Circular No.400
No Objection Certificates from relevant authorities
Shoring Design Review Checklist
No Objection Certificates from the neighbor or plot owner if the excavation anchors in the neighbor’s plot
Peer Review of the Geotechnical Third Party Report for more than 3 basements/or special projects near the water bodies.
Fees
Shoring Permit requires AED 0.05 on Total Built-Up-Area per square foot
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 5 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit, and Shoring and Piling Permit submissions shall be submitted separately. The approved Piling Permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment Letter duly signed by the owner, consultant, and/or the contractor
Geotechnical Design Calculations
Geotechnical Model - software design
Piling Design Drawings as per Circular No.400
Piling Design Review Checklist
Peer Review of the Geotechnical Third Party Report for building as per DM Circular No. 237
Fees
The piling Permit requires AED 0.1 on Total Built-Up-Area per square foot
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 5 working days for a completed application.
Note that a Sub-Structure Design Approval is required to be obtained before applying for this permit. The approved Sub-Structure Permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment Letter duly signed by the owner, consultant, and/or the contractor
Fees
Normal Submission requires a one-time fee of AED 0.2 per square foot on Total Built-Up-Area plus AED 20,000
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 2 working days for a completed application.
May 24, 2022
Are you having a hard time acquiring DCD approval for your construction projects in Dubai? You might be overlooking some essential details and requirements to gain Dubai Civil Defence approval. We sum up the most important details of how to get DCD Inspection and approvals for easy and convenient information access.
The vision of the Dubai Civil Defence has always stood firm “To have the United Arab Emirates as one of the best countries in the world in achieving Safety and Security”. With the objective to protect lives by providing safety and security to all industrial, commercial, residential, and public establishments in the Emirate. Acquisition of DCD Inspection and Completion Certificate are both important to assure that the vision of the government authority of Safety and Security is firmly established and followed. DCD Inspection requirements and processes are set accordingly on the e-services portal for a simple and hassle-free procedure.
Licenses for any construction activities are only issued through the Development Department of the Dubai Civil Defence by providing credentials to qualified engineers and fire safety and first aid officers who have taken and passed the relevant examinations, courses, and training. Most building projects in Dubai require DCD Inspections to certify compliance with the safety standards and regulations. The Completion Certificate will then be released by the authority after compliance is assured.
From Main Contractor
From Fire Fighting Contractor
From Main Contractor
From Main Contractor
From Main Contractor
Dubai Approvals Team ensures the compliance of safety standards of construction projects in Dubai for accurate DCD Inspection approval to swiftly acquire Completion Certificate. Our team offers excellent services on document submission, drawing approvals, acquisition of NOCs, and inspections are the key to helping our clients achieve quality and successful projects. We are looking forward to working with you, contact us for more DCD Approvals service details.
July 13, 2020
Dubai Electricity and Water Authority cover broad services, thus they provide an E-Services portal on their website for easy access to all of their services. DEWA Approval in Dubai embeds classifications of services depending on the requirements of the building and the standards of DEWA. DEWA aims to become a leading sustainable innovative global corporation, and dedicated to keeping up with the latest global industrial innovation. Hence, their innovative enhancement for effective services will supply sustainable electricity and water needs for all people in Dubai.
Dubai Electricity and Water Authority was established on January 1, 1992, by Sheikh Maktoum bin Rashid Al Maktoum. DEWA was formed from the union of the Dubai Electricity Company and Dubai Water Department, which were both state-run companies, separately providing electricity and water services for the people of Dubai. Its main purpose is to provide the people of Dubai with an adequate and reliable supply of electricity and water.
DEWA E-Services Process
The information below is based on the E-services of the DEWA for accurate and informative content.
Online DEWA Application Submission
Fill in the online application form with the required information, attach required documents, and submit the application. If the application is successful, a reference number will be provided which can be used for tracking the status of the DEWA application.
Application Status Tracking and Notifications
An e-mail and SMS notifications about the status of the application such as submission, rejection, revision, and/or approval. The status of the application can also be tracked online through the tracking page of the e-service.
DEWA Application Revision
If the application was found incomplete or incorrect, access the revision page from the e-service menu is authorized, and re-submit a revised application within 2 weeks. The application will automatically be canceled if failure of re-submission
Service Delivery
Once the request for an application is approved, it can be downloaded from the e-service tracking page.
DEWA Approval Services and Requirements
The following are the list of the common approvals and required documents for acquiring DEWA approval in Dubai. Other DEWA approval and services are all cited at the E-Service portal.
Building NOC
Building No Objection Certificate service allows contractors and consultants to acquire Electricity or Water No Objection Certificate for issuance of building permits. The application for service is free of charge, service is chargeable. The Building NOC process takes 3 working days for each service such as electricity and water.
Required Documents:
❏ Affection Plan
❏ Setting-Out Plan
❏ 24-Hour Demand
❏ Plumbing Layout/ including water storage tank capacity and location.
❏ Water demand and calculation sheet.
❏ Proposed meter location.
Getting Electricity Fit-out Connections
This is a free of charge service that enables customers to acquire a fit-out power connection for shops and offices. The contractor can submit for technical field inspection when the technical drawings are approved by DEWAm. Once subjected to inspection approval and upon securing the payment of Security Deposit, DEWA will arrange the installation of KWh meter and release of power connection. Notifications will be sent through the website.
There are two processes in getting Electricity Fit-out connections from DEWA such as:
❏ The Design Approval process that takes at least one working days and,
❏ The LV Inspection process wherein an appointment will be given within two working days from the readiness date notified by the contractor.
Required Documents:
❏ Copy of DEWA approved TCL/MD, MDBs/SMDBs, Main project schedule
❏ Load distribution schedules of distribution boards.
❏ Wiring Layouts – Lighting
❏ Wiring Layouts – Power
❏ Landlord NOC (In DEWA prescribed format)
❏ Tenancy Contract
❏ Trade License
❏ Passport Copy
Electric or Water Network Modification
Contractors or Consultants can submit an online application to obtain the Electricity and Water Network Modifications Service. The application for service is free of charge, service is chargeable. A notification will be sent through SMS and/or email when the Estimate is set.
Required Documents:
❏ Latest affection plan issued from Dubai Municipality or concerned authority.
❏ Approved load scheduled that indicates total connected load / maximum demand.
❏ Owner’s passport copy / Emirates ID Copy.
❏ Latest consumption bill issued by DEWA.
❏ No Demand Certificate from DEWA – Billing Department (In Substation cancellation cases only).
❏ Setting out a plan that indicates existing connections and proposed changes.
❏ Others (Any documents that may support the application).
New Electricity or Water Connection
The Estimate or Connection charges need to be settled first before the implementation of the DEWA service. A convenient tracking of the status of the application, upload additional documents, download the approved documents, project status notification for the technical inspection, etc. are possible through the E-Services portal.
New Electricity Connection
LV Design Approval:
❏ Load from 1‐150 Kw: 1 working day
❏ Load from 151‐400 Kw: 2 working days
❏ Load from 401‐5000 Kw: 3 working days
❏ Load from 5001 and above: 3 working days
Issuance of Connection Cost:
❏ Load from 1 to 150 Kw: 1 working day
❏ Load from 151 to 400 Kw: 3 working days
❏ Load from above 400 Kw: 3 working days
LV Inspection:
❏ Load from 1-150 Kw: 1 working days from the date preferred by the authorized electrical Contractor for the project
❏ Load from above 150 Kw: 2 working days from the date preferred by the authorized electrical Contractor for the project
HV Substation Location & size Approval (If Applicable)
❏ 3 working days
HV Substation Inspection (If Applicable)
❏ 1 working day from the date preferred by the authorized electrical Contractor for the project
Mandatory Documents:
❏ Total Connected Load/Max. Demand schedule (.pdf Format)
❏ MDBs/SMDBs Schedules (.pdf Format only)
❏ Single Line Diagram with proposed LV distribution and tariff metering (. dwf Format)
❏ Site setting lay-out and ground floor plan indicating the location of substation, LV room (along with dimensional details of LV room, arrangements of LV Panels, MDBs, KW meters, etc.) (. dwf Format)
❏ Ground floor and/or typical floor plan indicating the location of Electrical rooms/MDBs/SMDBs etc. (. dwf Format)
❏ General arrangements of KWh meters in the ground and/or typical floor electrical rooms (. dwf Format)
❏ Typical Load distribution schedule for the final distribution board. (.pdf Format)
❏ Affection Plan (.pdf Format)
❏ Passport copy/Trade License copy (.pdf Format)
Optional Documents:
❏ Green Building Regulation implementation documents. (.pdf format only)
❏ Technical specification of Chiller/Motor loads and other documents. (.pdf Format)
❏ Premise details sheet (.xls/.doc Format)
❏ Material requirements details (.xls/.doc Format)
❏ Consultant confirmation letter (No wet area, above electrical room/DBs, Circuit breaker/circuit cables, UV relays, ELCBs, etc.) in DEWA's prescribed format (.pdf Format)
❏ DM Approved Thermal Load Calculation sheet
New Water Connection
Types of Connections:
❏ Single: Premises that include a single meter (i.e. villa, hotel building… etc.).
❏ Multi: Premises containing more than one meter within the same property (i.e. building apartment).
❏ Development: Housing communities that have more than one meter within the area (i.e. Emaar Developments, DAMAC, etc.).
Water Connections Categories:
❏ Temporary connection (for construction purposes)
❏ Permanent connection
❏ Upgradation (increase of water demand)
❏ Diversion (shifting pipeline /meter)
Mandatory Documents:
❏ Building Permit/NOC
❏ Proposed location of meters and sub-meters
❏ Layout Drawing (i.e. floor plan indicating plumbing system)
❏ Water storage tank details (i.e. drawing inlet level, capacity, location)
❏ Green Building Regulation Implementation Documents (.pdf format only)
❏ Premise Details Sheet (.xls/.doc format)
❏ Meters Requirements Details (.xls/.doc Format)
❏ The total calculation for water consumption, as per building code and accommodation (pdf format)
❏ Site Plan (pdf format)
❏ Trade License copy (pdf format)
In acquiring DEWA Approval in Dubai, MEP consultants in Dubai experts are essential to precisely complete all the requirements within the schedule. There are capable MEP consultants in Dubai and Electrical Engineering specialists who can assist with concerns about obtaining DEWA Approval in Dubai. Dubai Approvals Team is a group of professionals, licensed to provide a one-stop engineering solution in Dubai. We have deep experiences in DEWA approval, DEWA Application, and other Dubai Approvals for engineering-related projects.
Read also DEWA – Ahead of Everything