May 24, 2022
Are you having a hard time acquiring DCD approval for your construction projects in Dubai? You might be overlooking some essential details and requirements to gain Dubai Civil Defence approval. We sum up the most important details of how to get DCD Inspection and approvals for easy and convenient information access.
The vision of the Dubai Civil Defence has always stood firm: “To have the United Arab Emirates as one of the best countries in the world in achieving Safety and Security”. To protect lives by providing safety and security to all industrial, commercial, residential, and public establishments in the Emirate. Acquisition of the DCD Inspection and Completion Certificate is both important to assure that the vision of the government authority of Safety and Security is firmly established and followed. DCD Inspection requirements and processes are set accordingly on the e-services portal for a simple and hassle-free procedure.
Licenses for any construction activities are only issued through the Development Department of the Dubai Civil Defence by providing credentials to qualified engineers and fire safety and first aid officers who have taken and passed the relevant examinations, courses, and training. Most building projects in Dubai require DCD Inspections to certify compliance with the safety standards and regulations. The Completion Certificate will then be released by the authority after compliance is assured.
From the Main Contractor
From Fire Fighting Contractor
From the Main Contractor
From the Main Contractor
From the Main Contractor
Dubai Approvals Team ensures the compliance of safety standards of construction projects in Dubai for accurate DCD Inspection approval to swiftly acquire the Completion Certificate. Our team offers excellent services on document submission, drawing approvals, acquisition of NOCs, and inspections are key to helping our clients achieve quality and successful projects. We are looking forward to working with you. Contact us for more DCD Approvals service details.
April 2, 2022
Indeed, Dubai has a lot to offer, starting from its luxury malls, breathtaking tourist spots, one-of-a-kind structures, beautiful multicultural people, unending career opportunities, and many more to mention. Its remarkable economic growth drives more business ventures that magnetize more construction opportunities all around the city. This means more projects on the line for authority approval services, which include the acquisition of permits before construction works. Permit provisions may vary on each project's scope, purpose, and compliance with the regulations imposed by the appropriate authorities, such as DDA. If you are an investor wanting to start a venture in Dubai or an entity looking forward to developing properties in the city by building or modifying structures for residential, commercial, or industrial purposes, here are the required permits you might need to acquire.
Note that a land Demarcation Certificate is required to be obtained before starting any activity at the site.
The approved permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment letter duly signed by the owner, consultant, and/or the contractor
Fees
Normal Submission
Total Built-Up-Area requires AED 1.00 per square foot with a minimum of AED 200.
Final Building Permit fees will be calculated after deducting the fees that were paid previously for the Interim & Preliminary Permit, excluding the Mobilization and Excavation Permits.
Industrial Use
Fees are not to exceed AED 250,000.
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 2 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit. The approved Mobilization Permit is valid for 6 months.
Required Documents
Building Permit Application
Appointment letter duly signed by the owner, consultant, and/or the contractor
Fees
Mobilization Permit requires AED 5,000
Mobilization for Villas requires AED 1,000 per Villa
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 2 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit. The approved Excavation Permit is valid for 6 months.
Required Documents
Building Permit Application
Appointment letter duly signed by the owner, consultant, and/or the contractor
Geotechnical design calculations of slope stability for open Excavation
Geotechnical Model - software designed
Excavation Design Drawings as per Circular No.400
No Objection Certificates from relevant authorities
Excavation Design Review Checklist
No Objection Certificates from the neighbor or plot owner if the excavation is within the neighbor's plot
Fees
An excavation Permit requires AED 5,000
Excavation Permit for Villas requires AED 1,000 per Villa
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 3 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit. The approved Shoring Permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment Letter duly signed by the owner, consultant, and/or the contractor
Geotechnical Design Calculations
Geotechnical Model - software design
Shoring Design Drawings as per Circular No.400
No Objection Certificates from relevant authorities
Shoring Design Review Checklist
No Objection Certificates from the neighbor or plot owner if the excavation anchors in the neighbor’s plot
Peer Review of the Geotechnical Third Party Report for more than 3 basements/or special projects near the water bodies.
Fees
Shoring Permit requires AED 0.05 on Total Built-Up Area per square foot
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 5 working days for a completed application.
Note that a Preliminary Design Approval is required to be obtained before applying for this permit, and Shoring and Piling Permit submissions shall be submitted separately. The approved Piling Permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment Letter duly signed by the owner, consultant, and/or the contractor
Geotechnical Design Calculations
Geotechnical Model - software design
Piling Design Drawings as per Circular No.400
Piling Design Review Checklist
Peer Review of the Geotechnical Third Party Report for building as per DM Circular No. 237
Fees
The piling Permit requires AED 0.1 on the Total built-up area per square foot
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 5 working days for a completed application.
Note that a Sub-Structure Design DDA Approval is required to be obtained before applying for this permit. The approved Sub-Structure Permit is valid for 4 years.
Required Documents
Building Permit Application
Appointment Letter duly signed by the owner, consultant, and/or the contractor
Fees
Normal Submission requires a one-time fee of AED 0.2 per square foot on Total Built-Up-Area plus AED 20,000
An additional fee of AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham is applicable per transaction.
This service process may take up to 2 working days for a completed application.
March 1, 2022
Dubai Electricity and Water Authority - DEWA provides the essential supply of electricity and water to customers across the emirate of Dubai. The authority endeavors to provide the highest quality customer service with reliable, clean, and safe electricity and water utilities. DEWA applications for getting electricity and water services can be submitted through the authority’s E-Services system. Dubai Approvals Team helps clients with the document and drawing completion, application, and approval acquisition for various construction projects.
DEWA Completion Certificate and As-Built Approval are needed for the final clearance of proposed projects before starting any construction work. The requirements needed for the application, such as technical documents and drawings, included in the list below, must be submitted and will be technically reviewed for approval. Preparation of an estimate on connection charges will then be further processed by the authority for field inspection and other relevant services needed. These estimates and charges will be subject to payment subsequently, and field works and inspections from the authority’s side will be carried out.
The Completion Certificate for the Final Clearance and As-Built Approval submission requirements include the below:
1. Cover Letter addressed to the Senior Manager from the Infrastructure Information & Permits Department.
2. Copy of DEWA ED approved As-Built drawing in PDF Format - For Completion Certificate Application.
3. Full set of DEWA ED approved shop drawing with NOC for ED -Ducts and/or Cable Diversions along with NOC letter in PDF Format.
4. Full set of DEWA WD approved shop drawing NOC for Water Network Diversions and/or protection works, along with the NOC letter as per the scope of work in PDF Format - For Completion Certificate Application
5. Full set of DEWA ED & WD construction NOC along with NOC letter in PDF Format
6. Key plan indicating the full project area - For Completion Certificate Application.
7. Project As-Built Drawing integrating DEWA services approved by project consultants & contractors are as follows:
8. The following is to be provided, whichever is applicable:
9. Material Reconciliation Statement - MRS as per DEWA standard format for cable and Betterment ducts in PDF Format, along with the following documents for Completion Certificate Application.
10. Final Duct summary details for DEWA ED Betterment Work only as per DEWA standard format, signed and stamped by project consultants and contractors in PDF Format.
11. DEWA Approval letter of material if procured from outside.
12. Copy of DEWA ED Approved BOQ for Betterment Work, applicable to RTA Projects.
13. Final actual Cost BOQ for DEWA ED betterment work acknowledged by RTA, applicable to RTA Projects for Completion Certificate Application.
14. Duct and Duct Marker inspection record signed by DEWA ED representative for the future proposed spare, split, and extension Ducts.
15. CSV files by DEWA digital submission standard.
16. DEWA Water Department checklist clearance acknowledged by DEWA Water Project, for Completion Certificate Application.
17. Cable backfilling checklist for 6.6 kV, 11 kV & 33 kV slewing, raising, and lowering work, if Applicable.
Clients can track the status of the application, upload and submit additional documents, download the approved documents, receive project status notifications for technical inspection, and many more through the E-service one window system. Our team understands how necessary the DEWA Application on Completion Certificate is for the Final Clearance and As-Built Approval to projects, hence, we provide the right and accurate support for the acquisition of approvals.
November 25, 2021
The construction industry in Dubai has changed remarkably in the past decades. The government and development sector have come a long way in evolving the desert land into a concrete empire. Dubai showcases high precedence in the development of the living and work environment, upgrading the lifestyle while keeping it humble in sustaining cultural significance. Authorities such as Dubai Civil Defence see through the possible ways to ensure the safety of the public and workers while construction developments roll out in every corner of the city.
We have seen the advancement of construction technology worldwide, building better and safer structures to live and work in. This advancement may provide improved structure and infrastructure, however, the construction industry is one of the most dangerous in the world without the proper safety precautions and practices. The Dubai Civil Defence Department of Preventive Safety has been intensifying its standards and regulations to help avoid construction safety hazards. It is important to know about these safety risks in construction and what it takes to avoid them.
Construction may be one of the riskiest sectors to work in; however, the implementation of safety precautions comes with the existence of hazards regardless of the industry or the circumstances. Here are the most common safety hazards that are responsible for the majority of construction fatalities, and the precaution standards that may help to prevent further casualties imposed by authorities such as Dubai Civil Defence to acquire DCD approvals.
Falls
Falls are a common accident in construction. Regardless of how high or low a structure is falling could still result in a crippling or even fatal injury. Preventing falls is possible with the strict implementation of the usage of proper fall arrest systems.
Electrical Exposure
This is a safety hazard that is expected whenever a live wire exists. Preventive measures for electrocution, such as LOTO or lock-out/tag-out routine which are necessary for equipment that requires repairs or maintenance.
Struck-By
An extensive risk is caused by a variety of material fragments in different shapes and sizes. Workers and even the public can be in danger from these falling objects, which can result in casualties. Safety measures such as wearing appropriate Personal Protective Equipment, or PPE, like hard hats, are required for on-site workers. For the public, be cautious by using the allotted pedestrian walks or crossings, or take an alternative way if possible when passing by a construction site.
Caught-In or Caught-Between
One of the most dangerous circumstances that cause serious injuries and death. The risk may happen when a part of the structure collapses or falls. The best way to prevent this safety hazard is to administer precautions, keeping pedestrians from probable hazard points or areas.
Noise Hazards
Hearing difficulty instances happened to construction workers who suffered from noise hazards from their on-site jobs. The exposure to noise hazards can be minimized or even eliminated through the use of hearing protection equipment and proper PPE.
Hand-Arm Vibration Syndrome
Working with heavy vibrating equipment for a prolonged period might result in HAVS or Hand-arm vibration syndrome, a condition that involves muscle weakness, permanent nerve damage, and other issues. Taking frequent breaks while operating heavy equipment is a simple prevention that needs to be implemented to prevent excessive damage.
Air Quality
Various sources can negatively affect the air quality within the construction vicinity, such as smoke from vehicle exhaust, fiberglass fragments, inhalable silicon dust, and many more. These variables can put everyone on the site at risk of respiratory conditions. However, it can be intercepted in multiple ways, which include proper ventilation and provision of respirators in prone areas.
Lack of PPE
Without the strict implementation of utilizing Proper Protective Equipment, safety can always be at risk. Workers can use specific PPE that is essential and designed for their particular work line. Specific PPE includes respirators for poor air quality conditions, gloves to prevent electrocution, hard hats to prevent falling materials, and many other types of equipment that prevent injury or death.
Fire Hazards
High risks stand along when working with fire hazards such as corrosive chemicals and flammable materials. These substances might cause explosions and fire breaks, endangering workers and the public. Dubai Civil Defence is one of the authorities worldwide that greatly implements fire safety regulations in their respective jurisdictions, ensuring that all flammable chemicals or materials are properly stored with the fire safety plan applied. And that every worker must learn and understand fire prevention and their responsibilities during the occurrence of a fire or explosion.
Construction in Dubai may be one of the fastest-growing industries, and safety risks are always present, yet can be prevented. DCD implements prevention methods that are set as standards for acquiring authority approvals and NOCs. The common safety hazards stated can be prevented through the standards provided by authorities, yet safety depends on the implementation of safety plans in construction sites.
October 17, 2021
The Dubai Development Authority Fit-out Guideline comprises general information, procedures, technical requirements, and HSE regulations established to assist building owners and tenants, designers, fit-out consultants, and fit-out contractors to effectively plan and design overall fit-out works. Significantly, every fit-out consultant or fit-out contractor abides by the guidelines and regulations that give them the responsibility for ensuring that the design and completion of the fit-out project are made as per local statutory requirements and relevant international standards. This fit-out guideline applies to all residential, industrial, institutional, or commercial establishments within the jurisdiction of the DDA Zoning Authority that undertake new fit-out works, fit-out additions, and fit-out modifications.
A. The building owner or tenants can start their fit-out activities in any of these phases:
Building under Construction Phase.
The fit-out design review to be incorporated during the construction phase will be considered as a Building Design Revision.
The main consultant shall submit through the DDA Zoning Authority under the Design Revision Form.
Issuance of Taking Over Certificate from Consultant to Contractor.
Before the issuance of the building completion certificate, every initiation of Fit-out during this stage requires an undertaking from the main consultant and main construction contractor. The owner shall obtain an undertaking through the DDA Zoning Authority form under Undertaking for Fit-out Works.
The building owner shall appoint a Fit-out Coordinator and Facility Management Operator to collaborate with the DDA Zoning Authority.
The building owner shall submit a Fit Out Initiation Application along with the required documents, such as an Undertaking for Fit-out works, and complete contact details.
The DDA Zoning Authority shall then issue a Reference Number for the Fit-out Initiation, which should be referred to for any further fit-out submittals, such as general or minor fit-out works.
Issuance of the Building Completion Certificate from the DDA Zoning Authority to the contractor.
The building owner shall appoint a Fit-out Coordinator & Facility Management Operator to collaborate with the Zoning Authority.
The building owner shall submit a Fit Out Initiation Application along with the required documents and complete contact details.
The DDA Zoning Authority shall then issue a Reference Number for the Fit-out Initiation, which should be referred to for any further fit-out submittals, such as general or minor fit-out works.
The building is ready to be occupied.
B. The Fit-out Coordinator shall obtain As-built Drawings or building specifications from the client.
C. The client proposes fit-out requirements to the Fit-out Coordinator.
A. Fit-out Permit Request for the General Works
The fit-out coordinator is responsible for submitting the proposed fit-out layout through the Fit-out Permit Request for General Works, along with the required documents such as follows.
General Documents
Drawing Layouts
The layout of the drawings should be submitted in A1 size for hard copies and in DWG format for soft copies.
1. 2 Sets of existing As-Built drawings
2. 2 Sets of Proposed Architectural Layout
Plan
Section
Internal Views
Reflected Ceiling Layouts
Corridor Width and Height, if any.
Fire and Life Safety Schemes, if any.
3. 2 Sets of Proposed Structural Layout, if applicable.
4. 2 Sets of Proposed MEP Layout.
HVAC and Ventilation Layout.
Drainage Layout, if applicable.
Water Supply Layout, if applicable.
Mechanical Equipment Schedule
Power Layout indicating the Meter Location.
Power Layout
Lighting Layout
Load Schedule
Single Line Diagram
Existing DEWA-approved Single Line Diagram and Load Schedule
Fire Alarm and Fire Fighting Layout certified by System Integrator
LPG Layout, if any.
Grease Interceptor for kitchen or restaurant, if applicable.
Coordinated Reflected Ceiling Plan - RCP with Final MEP Fix Layout.
B. Fit-out Permit Request for the Minor Works
Fit-out Coordinator shall submit the proposed fit-out layout through the Fit-out Permit Request for Minor Works, along with the required documents as follows:
March 30, 2021
As of the year 2020, Dubai Civil Defence has marked its growth in transactions that mirror its efforts to provide the highest possible quality of customer service and integrate best practices as part of its vision of enhancing customer happiness. The authority continues to implement safety and security services all over the city to UAE and international norms. The DCD approval authority’s efforts on its safety preventive measures and regulations have been successful and will be pursued in the upcoming years. The Department of Preventive Safety ensures the safety of the people at all costs by securing safety in all places, including in and out of buildings and infrastructures.
The Department of Preventive Safety is a DCD-approved service tasked with implementing safety measures in engineering and construction developmental projects such as residential, commercial, and industrial buildings. This service aims to enhance building constructions according to efficiency and effectiveness standards. Dubai Civil Defence issues and renews licenses of private and public establishments as per the rules and regulations. It is a norm of the authority to conduct scheduled and surprise inspections for various establishments and factories to ensure concurrence with preventive safety measures.
This department includes accessible services and downloadable files of forms, standards, and regulations for various establishments and industries on categorized options such as Licensing Requirements for Building and Facilities, Reasons for Rejection, Customer Service Request Forms, and Companies Approval and Licensing.
Engineering and construction sectors generally use the services under the Licensing Requirements for Building and Facilities category as major requirements to gain Dubai Civil Defence approval for developmental projects. This category includes, but is not limited to, information, guidelines, and forms regarding services such as the UAE Fire and Life Safety Code of Practice, Drawing Submission Requirements, Facade Submission Requirements, Facade Glazing Roofing, Material Test Standards, and more, as requirements for DCD approval. With the enhanced Dubai Civil Defence services, 2020 demonstrated the high prioritized places on customer happiness and its venture to implement strategic plans on preventive safety objectives that can enhance the community’s wellbeing. DCD also integrated its electronic and smart platforms, which provided excellent accessibility, reliability, efficiency, and high-quality services.
Dubai is recognized as one of the safest cities in the world,d that proves the strong pillars of rules and regulations imposed by every government sector of the country, including the Dubai Civil Defence. The construction and engineering industry of the city has been a milestone of innovation, and Dubai Civil Defence's approval of high standards gave assurance of safety with the help of every relevant authority and their incredible and reliable services.
Dubai Approvals Team has been a run-to firm for clients who seek a hassle-free and smooth authority approvals for engineering and construction projects around the city. We are confident to say that we have accumulated maximum experience of the Dubai Civil Defence approval process and other relevant authority approvals, which upgrades our services to the best quality it can be. Our professional team assures accurate and prompt services on requirement completion and submission to approval, and certificate acquisitions.
May 8, 2021
Countless building modifications in Dubai are very prominent, all because of the continuous economic and business growth in the city. Many residential dwellings require modifications to improve the design and to install more innovative and sustainable features to upgrade the lifestyle, providing comfort to the occupants. Numerous public and private facilities also need expansion of capacities, maintenance of supply, and installation of types of equipment to proffer advantage to the quality of services and maximize productivity. DDA Dubai imposes several standards and requirements to gain approval for Building modifications and permits. All kinds of improvements, whether minor or major, in a certain facility under the Dubai Development Authority clusters will need DDA approval on the required drawings and plans, submission of No Objection Certificates, and other necessary documents to acquire permits.
Dubai Development Authority - DDA, as was Dubai Creative Cluster Authority - DCCA, is the regulatory entity of various free zones, residential communities, and business parks across the city. These individual cluster environments under the authority operate numerous business developments which contribute to the economic growth of the city, supporting the enhancements of lifestyle. Diverse industries in its jurisdiction promote efficient interaction and collaboration, giving out partnerships and job opportunities, also resulting in more business and accommodation developments. With the continuous progress around the city, DDA Dubai governs every developmental project within its clusters, including building modifications and permit issuance by the standards and requirements of the authority and other relevant departments.
If you plan to start a business or modify a residential property under Dubai Development Authority clusters, you might need assistance from engineering consultants and construction companies in Dubai. These experts will help you complete the necessary drawings and documents on their part. There are also experienced firms that offer approval process assistance, such as completion and submission of every requirement from both engineering consultants and contractors to DDA Dubai. For more ideas on the process, here is a list of the requirements needed to gain DDA approval for building modifications and permits.
In the case that you plan to apply through the DDA customer service center, a Building Modification Approval Application document is a prerequisite. Take note that the validity of an Approved Design is only for 6 months. Fees for normal submission are AED 1500 and an additional AED 1 per square foot to the total relevant build-up area. Moreover, additional fees apply per transaction, such as AED 10 for Knowledge Dirham and AED 10 for Innovation Dirham. The process duration for a completed application of Design and Permit Request or Design Request will be within 5 working days. And the process duration for a completed application of the Permit Request will be within 2 working days.
Requirements for Design and Permit Request by the Appointed Contractor
An approved and stamped set of drawings and proposed drawings highlighting the changes by Circular No. 229
No Objection Certificate from the Building Owner
Contractor Appointment Letter from the Building Owner or Tenant
Approved and stamped Proposed Project Details Sheet, duly signed by the Consultant
Soft copy of Structural calculations and models
No Objection Certificate from Dubai Civil Defence
The layout of Site Mobilization
Requirements for Design Request by the Appointed Consultant
An approved and stamped set of drawings and proposed drawings highlighting the changes by Circular No. 229
No Objection Certificate from the Building Owner
Consultant Appointment Letter from the Building Owner or Tenant
Approved and stamped Proposed Project Details Sheet signed by the Consultant
Soft copy of Structural calculations and models
No Objection Certificate from Dubai Civil Defence
Requirements for Permit Request by the Appointed Contractor
Contractor Appointment Letter from the Building Owner or Tenant
The layout of Site Mobilization
Dubai Approvals Team will help you with your DDA approval application for building modification and permit. We are confident to offer our services for your convenience with our breadth of expertise in the process of any relevant authority approvals acquisition for your engineering projects in Dubai.
March 20, 2021
Dubai has unlocked huge opportunities through the launch of the Dubai 2040 Master Plan. The city has again widely opened its doors to more developments focusing on greener and sustainable urbanization across its jurisdiction. This endeavor gives big chances to investors, companies, professionals, skilled workers, and other individuals who want to be part of the city’s new innovative vision. Authorities will also play a big role in the implementation of the Master Plan with their respective standards and requirements in acquiring necessary approvals, including from DM Dubai.
Dubai Municipality approval is one of the most important requirements to start a developmental project in the city. DM Dubai has been consistent with its approval regulations to set standards of innovation for high-quality projects that will benefit not only the government but the whole community. The results of the journey to innovation of the city have proven the wide range of capabilities of DM approval and other relevant authorities in giving out the highest standard of project approvals to fulfill the government’s vision. The competence of Dubai approval authorities creates a huge impact on the city’s future endeavors and goals. The world has already witnessed the whole country’s role in urbanization, and now it will anticipate the continuity of this vision through the Dubai 2040 Master Plan for sustainability.
Dubai Municipality, or DM, is one of the main authorities that hold the regulatory services for developmental projects within the city, including the recent Dubai 2040 Master Plan. With the vision of the Master Plan to cater to sustainable developments in five major urban areas of the city, which are mostly under the jurisdiction of Dubai Municipality, authority approval gives a huge responsibility to DM Dubai to raise its services to a higher level. It has been their objective to provide the highest standard of public services through innovation for many years. And with this futuristic goal, it will certainly set standards that will upgrade every project into the best it could be, focusing on sustainability.
The plan emphasizes the development and progress in five main urban areas, which include the three existing urban centers and two new centers in Dubai. These major areas were stated to be Deira and Bur Dubai, Downtown and Business Bay, Dubai Marina and Jumeirah Beach Residence, Expo 2020, and Dubai Silicon Oasis. Focusing on the objectives of developing sustainable housing complexes, hospitals, schools, service centers, and leisure centers for the growth of the economic sector and to increase job opportunities for the population. A greener environment with commercial centers and recreational facilities that aim to enhance human well-being highlights the master plan. It is a huge step to revive the huge loss of environmental features in the city and a preparation for a better and greener future.
DM approval is expected to follow the objectives of the 2040 Master Plan for sustainable urban development across the emirate, aiming to be a world-class city providing the best quality of lifestyle with the highest possible standards of urban infrastructure and facilities. For the next five decades, the plan is arranged to focus on enhancing the community’s well-being and quality of life. It is also set to strengthen the competitiveness of the emirate to constantly be known as a global hub for economics and innovation, and a tourism destination by providing a wide diversification of lifestyle and offering investment opportunities to citizens, residents, and visitors within two decades.
These incredible nature-friendly developments reflect the future integration of Dubai approval professionals, contractors, designers, and top engineering companies in Dubai to showcase their creativity and versatility in future sustainable and innovative projects. And it's the responsibility of DM Dubai to filter every proposal that is worthy of gaining Dubai Municipality approval. The consistency of outstanding urbanization through the high standards of approval authorities, including DM approval admired the country and the world. Dubai proved that its diversification benefited not only the government and the citizens but also the multicultural communities that have contributed to its economic growth and urbanization. To be a part of the Dubai 2040 Master Plan vision is a pride that every benefactor will hold on to into the future.
January 3, 2021
This year may have been one of the most challenging years since we started providing engineering and approval services in Dubai, contributing to UAE’s objective of becoming one of the world's best countries that gives everyone a world-class, safe, and secure living experience. The government has constantly achieved its objectives to fulfill its vision by implementing rules and standards in every aspect of its governance, including the engineering, architecture, and construction industry. We, at Dubai Approvals Team, aim to make Dubai approvals easy for every client who needs to acquire engineering approvals, permits, and licenses from various authorities in Dubai.
Dubai Approvals Team has been consistent in delivering services generally in the engineering, architecture, and construction industry throughout this year. We made sure that we provided swift and quality assistance to every client and their projects. Our team never fails to provide services on acquiring Dubai approvals and assures the acquisition of any kind of requirements needed to gain project permits and licenses from various Dubai authorities.
List of some of our services on Dubai approvals from the respective Authorities
Dubai Municipality Approval
Dubai Municipality approval, or DM Approval, is needed for any kind of development project in Dubai. Dubai Municipality approval sets planning requirements that focus on establishing modern, sustainable, and unified communities showcasing the ethics and the culture of Dubai, with the capability to provide a remarkable lifestyle to the people of Dubai. These Dubai Municipality approval standards and requirements comprise the cornerstones of architecture and civil engineering, housing and health facilities, coordination sites and architecture, roads, economic and social studies, and statistical studies relevant to the growth of economic rates in Dubai.
Dubai Civil Defence Approval
Dubai Civil Defence is one of the major authorities that play an important role in maintaining high-quality safety and security in industrial plants, factories, and commercial buildings in Dubai through Dubai Civil Defence approval. Engineering projects in Dubai involving industrial facilities, commercial establishments, and apartment complexes are all required to obtain DCD approval and inspections before, during, and after both construction and renovation projects from Dubai Civil Defence.
Dubai Development Authority Approval
Dubai Development Authority or DDA is the government entity that is responsible for governing the development control, municipal, and economic over various free zones, parks, and other communities by several master developers in Dubai. DDA also focuses on real estate planning and developments implementing standards on Dubai Development Authority approval on licenses and permits.
Dubai Electricity and Water Authority Approval
Dubai Electricity and Water Authority or DEWA Approval in Dubai includes classifications of services, considering the requirements of the building and the DEWA standards. DEWA approval focuses on becoming a leading sustainable innovative global corporation and is committed to sustaining services with the latest global industrial innovation through providing effective and quality services in Dubai.
Dubai Health Authority Approval
The Dubai government is dedicated to providing its residents with the best medical facilities and access to quality healthcare services. Thus, the Dubai Health Authority approval was implemented following the fulfillment to contribute to upgraded healthcare facilities. The standards on Clinic approval and other healthcare establishments under the standards of DHA approval uplift quality and innovative facilities, ready to provide world-class service to everyone.
Dubai Silicon Oasis
Dubai Silicon Oasis is one of the several Free zones in Dubai known to be of a kind technology park in UAE. DSO is ruled by the DSO Authority by imposing standards and regulations with requirements for business and engineering approvals within its mandate. The DSO Authority approval standards help to successfully achieve Dubai’s aim to be the world’s best business hub for electronics and technology with high-quality and upskilled human resources and investors.
Dubai Tourism and Commerce Marketing
Department of Tourism and Commerce Marketing or DTCM Dubai provides a DTCM permit which is a part of permit requirements for events and other projects involving tourism and commerce. Dubai, being considered a top travel destination in the Middle East, proves its capabilities to provide entertainment and world-class hospitality facilities with the help of DTCM Dubai regulated by DTCM permit standards.
JAFZA
The world’s largest Free zone, JAFZA, has boosted Dubai’s economic industry and built up a relationship with other foreign countries. To continuously boost the well-started economic development, the Jebel Ali Free Zone Authority set regulations for gaining JAFZA approval for any engineering projects within the largest Free Zone’s dominion.
Trakhees
Trakhees is responsible for various developments such as lands, port areas, Dubai World, and other areas within its jurisdiction, and acts as the authorized body for providing business approvals and licenses in the development of certain areas in Dubai. Trakhees approval ensures high-quality and efficient infrastructural development with the help of its professionals in sectors such as the Environment, Health and Safety Department, Commercial Licensing Department, Civil Engineering Department, and Corporate Excellence Department.
We also provide services in acquiring approval and licenses for shisha cafes license, smoking permits, restaurants, signage, spa approvals, tents, solar, swimming pools approvals, and many more. This year 2021, the Dubai Approvals Team will level up our capabilities in providing high-quality approval and engineering services and cater to our clients’ needs. We will make sure to make Dubai approvals easy for everyone.
September 12, 2020
The United Arab Emirates has overcome many challenges in its history and is now considered one of the world's leaders in many sectors. The population growth in the UAE, which many people all around the world are looking forward to, the many business and career opportunities, and the advantages the UAE offers. This population growth allowed opportunities for job and business sectors, including the healthcare field in public and private hospitals and clinics. The Dubai government’s commitment to providing its residents with the best medical facilities and healthcare services. To provide quality healthcare services in the country, the Dubai government established the Dubai Health Authority, which contributes to healthcare and also rules Clinic approval and other healthcare establishments under the standards of DHA approval. This initiative emphasizes the availability of safe healthcare facilities for the multicultural population of Dubai and the whole UAE.
Clinic Approval
To acquire Clinic Approval in Dubai, one needs to have a medical degree or have to be a Director with a relevant profession and qualification. Requirements such as an international diploma or degree need to be subjected to attestation following the certification procedure in the UAE to open a private hospital or clinic in Dubai. Every medical personnel and professional must also be certified by all means by the Dubai Healthcare Authority or DHA. Proficiency in the English language, in verbal and written, is also mandatory for all medical personnel.
Dubai Healthcare Authority has 4 branches, namely, Healthcare, Education & Research, Investment, and Regulatory, which all contribute to overall licensing and approvals for medical professionals and centers to maintain the best practice in healthcare delivery in the largest healthcare Freezone in the world, the Dubai Healthcare City. Dubai Health Authority approval or DHA Approval in Dubai, includes services for all kinds of clinics.
6 Steps in obtaining a DHA approval and license for opening a private clinic or private hospital in Dubai.
The Initial approval prerequisites are the following requirements for the Clinic Approval application.
The owner should submit all the accomplished documents, a photocopy of the initial approval, and the registration fee, along with the following for the Final approval.
Acquiring Clinic Approval from the Dubai Healthcare Authority is a precise process that assures to preserve the goal of regulating and supervising the actions of all the medical professions, hospitals, clinics, and other medical service providers. Every medical professional or business investor who probes to start a private hospital or clinic in Dubai is required to obtain DHA Authority approvals.