Are You Looking for Any Agency That Can Help You to Gain Dubai Municipality Approval? Just Get in Touch With Us to Get Easy DM Approval.
Dubai Approvals Team is a licensed engineering company in Dubai that provides you with the best engineering solutions to get easy Dubai Municipality Approvals for offices, restaurants, cafeterias, etc. Our team of experts will ensure you'll have the Dubai Municipality Approval, also known as DM Approval, for your offices, restaurants, or warehouse as soon as possible without any kind of fuss. You can also consult our experts if you are having any problem with getting other related Approvals from Dubai Municipality. Our services are available all the time of year throughout the state of Dubai.
Dubai Municipality, or DM, provides approval services for building permits and other licenses for new buildings and redevelopments of existing buildings. Any private and government entities, individuals, and businesses with proposed building plans can benefit from this service and get approval from DM for their projects. The approval service can be acquired for proposed drawings and plans of developmental projects in the jurisdiction of DM. Some of the various types of projects that are covered under this service include single- and multi-story buildings, industrial structures, villas, and floor-to-floor ratio areas. The Dubai Municipality approval assures that every project complies with the standards and guidelines of the authority; if not, no physical work should be initiated.
Office Approval
As per the law of Dubai, Dubai Municipality, or DM Dubai, corroborates the process of approving the offices to be established in the Dubai region. Some various requirements and documents need to be submitted before you can get any Dubai municipality approval. The first thing that may be put into inspection by the Dubai Municipality is the building in which the office is to be set up and the purpose of the office. Dubai Municipality will cross-check the legality of the building and the purpose of the office before going to other documents.
Restaurant Approval
Getting Dubai Municipality's approval for a commercial, such as a restaurant, can be quite a daunting task. We are a licensed engineering company that provides you with the layout to get approvals from the DM authority, such as the Food Control Department Dubai, for DM approval. Without the final approval from the Food Control Department, the restaurant cannot start business.
The floors and the ceiling should be easily cleanable. It should have a proper drainage system, and the materials used to build the restaurant should be fireproof, light-colored, smooth, and non-toxic.
Along with these office and restaurant approvals, we provide you with the best engineering options for your warehouse mezzanine.
The procedure for obtaining Dubai Municipality Approval can differ based on the particular requirements for which you are requesting approval. However, the majority of the DM approval process has some general steps that are common, such as the following:
Determine the relevant department: The first step in the Dubai Municipality approval process is finding the relevant department that is in charge of checking and processing your application.
Submit the application form: Once you have found the relevant approval process department, you need to submit the application form to process your dm approval.
Pay Application Fees: You need to pay the required amount along with the application form. The amount varies depending on the requirements that you are submitting for approval.
Submit the supporting documents.: You will also be required to submit some necessary supporting documents along with the application form and payment. The supporting documents vary according to the requirements for which you are applying for approval.
Await the Dubai Municipality's team response: After applying along with the necessary supporting documents, the Dubai Municipality team will check your application and issue a determination. The complexity of your application may affect how long it takes the Dubai Municipality team to respond.
Get Your Approval: A certificate of approval will be issued to you if your application is accepted. Usually, this certificate has a one-year expiration date and needs to be renewed every year.
Before submitting your application, make sure you have all the necessary supporting documents. This will make it more likely that your application will be processed quickly and effectively.
Be ready to respond to any inquiries regarding your application that the Dubai Municipality may have. It's better to have a clear idea of the requirements for which you need approval. The approval procedure with the Dubai Municipality can be lengthy, particularly in cases of complicated applications.
Please check for other types of Dubai Approvals for further assistance.
To get DM approvals provided by the Dubai Municipality Portal, or DM Dubai, please visit our DM Approvals Team. We can also help you know all the approvals provided by the Dubai Municipality here. You can Contact Us for any of your queries.
May 4, 2019
The Dubai Municipality, or DM, has come a long way since its establishment on February 28th, 1957, by the first decree. It provides municipal services to the population of Dubai and its work includes urban planning, construction supervision, environmental protection and improvement, public parks conservation, regulating and ensuring international quality standards compliance in aspects such as
DM, having begun with just 3 operating employees, has grown into an organization having more than 15,000 staff working in 32 organizational units, making it a major driving force in the development of Dubai City. With a vision of “Developing a happy and sustainable city,” the Dubai Municipality is also instrumental in maintaining the architectural heritage of the emirate by revival and maintenance of many cultural landmarks.
The DM Dubai is currently composed of 34 departments under six sectors, namely:
The services offered by these sectors are segregated into individual, government, and business-centric, with the focus of DM Dubai quality control on areas such as Environment and waste, Financial and business, building and land planning, lab testing and accreditation, Public health and consumer safety, drainage and irrigation, veterinary, agriculture and public markets services.
An example of planning assistance by DM
The DM Dubai has a planning division that allows streamlined submissions to be made from the user end and a legislative system in place to demarcate its jurisdiction to acquire the Dubai Municipality Approval. One example of planning assistance is guidelines for the submission of a Master plan for building plan proposals. Here, the applicant submits a draft proposal for preliminary assessment that covers ownership, on-site, and surrounding region description. Following this, a final assessment submission requires Non-Objection Certificates from the concerned local authorities (Dubai Police, Civil Aviation, Road Transport Authority, Dubai Electricity, Water Authority, etc). Finally, the DM provides a “sign-off sheet” to all service authorities to get Dubai Municipality Approval for their master plan.
After completing all these procedures, a follow-up application needs to be filed online at the Dubai Municipality which consists of paying the application fee as well.
Non-Compliance Crackdowns – Serious Quality Assurance
The year 2011 was a dramatic one for the DM. This was primarily due to the disconnection of utility services to many residential, industrial, and commercial buildings as a result of illegal modifications, partitions, and additions that were made. Warning notices were first sent, following which heavy fines were levied to discourage non-compliance. Repeated offenses meant that utility services to the offenders were cut off through the Dubai Electricity and Water Authority - DEWA. Sometimes unauthorized changes to buildings also run the risk of a lack of fire exits or basic health requirements, and ambiance quality like lighting and ventilation. Once corrective action was taken, the services were restored to these locations.
Also, read Some Facts about Dubai Municipality (DM)
May 4, 2019
Since its Industrial Revolution, Dubai has provided numerous opportunities for everyone looking to achieve heights of success, and it is continuing to do so as of 2021. Today, Dubai has become an international hub where people from all backgrounds are competing against each other. To cope with the growing industrialization and infrastructure demand, it becomes very important to set a bar of standards for ensuring safety and security. The government of Dubai has handed over this responsibility to Trakhees.
It is worth noting that if you are planning to set up your project in Dubai (under Trakhees Jurisdiction), you have to follow certain rules and regulations set by Trakhees. Moreover, you need to have a permit or approval to commence the construction work. But the fact of the matter is that sometimes the whole process of getting Trakhees' approval can be a bit difficult if you have not followed the procedures properly. Let’s make it simple for you and discuss what you need to do so that you can get approvals easily:
Before discussing how to get an environmental permit, it should be noted that there are various types of environmental permits, and each of them has its specific applicability. They can be listed as:
Harbor / Open Sea Discharge Permit: Applicable for projects disposing of treated wastewater to the open sea.
The step-by-step procedure for getting environmental approval from Trakhees is as follows:
Type Of Permit | Amount To Be Paid Per Approval |
Open Sea Discharge Permit | AED 500 |
Irrigation Permit | AED 500 |
Groundwater Discharge Permit | AED 500 |
Air Emission Permit | AED 500 |
Permit to Cut and Relocate Trees | AED 1000 for Application fees.
AED 500 for every 10 trees to be cut. |
Permit to Operate Captive Marine Mammal Facility or Public Aquarium Facility | AED 1000 for Application fees.
AED 5000 for Approval Fees. |
Permit to Transport Marine Mammal or Aquatic Animal | AED 1000 for Application fees.
AED 500 for Approval Fees. |
Permit to Conduct Scientific Research on Marine Mammal or Aquatic Animal |
AED 1000 for Application fees.
AED 200 for Approval Fees. |
Permit to Export / Import Marine Mammal or Aquatic Animal |
AED 1000 for Application fees.
AED 500 for Approval Fees. |
Coral Translocation Permit | AED 1000 for Application fees.
AED 10,000 for Approval Fees. |
NOC for Dredging and Reclamation | AED 1000 for Application fees.
AED 500 for Approval Fees. |
Permit to Transport Sand | AED 500 |
If you follow the procedure as per the given guidelines, it will be easy for you to get Trakhees Approval. Let us help you with your Dubai Approvals procedures, wherein our experts will help you anytime and anywhere so that you do not have to deal with the resubmission of your application. Not only that, but we also help you with DEWA approval, Dubai Municipality Approval, Jafza Approval, and approvals from many more authorities in Dubai. So, feel free to visit us and allow us to serve you for easy approvals.
Also, read How to get warehouse mezzanine approval in Dubai.
May 4, 2019
Dubai is one of the most favorite destinations for every person in the world. With new technologies and innovations being introduced now and then, Dubai proudly holds the title of “The City of the Future”. People from all around the globe come to Dubai to experience a better lifestyle, but moving to Dubai was not always that easy. As Dubai was emerging as an international hub, it was attracting people from everywhere, but the only problem was that foreigners were not allowed to buy properties. EMAAR made it possible for every person, irrespective of his/her citizenship, to own a property in Dubai. As most of the landmark locations in Dubai are masterpieces from EMAAR, so, let’s take a look at the 4 best engineering projects of EMAAR Dubai as of 2021:
EMAAR has not only utilized its innovative ideas to construct a luxurious Dubai, rather it has aalso lways piloted unique projects around the globe. Though based in the UAE, EMAAR has extended its reach by spreading across various countries like India – EMAAR India, Egypt – EMAAR MISR, Pakistan – EMAAR Pakistan, etc. Also, Emaar Community Management is the only organization outside the USA to become an Accredited Association Management Company, providing professional association and community management services.
If you are also planning to buy a property in Dubai and are confused with the approval processes from various authorities of Dubai, including EMAAR approval, we are here to help you. Dubai Approvals team will provide you step by step information for getting approvals for your projects without any hindrance.
May 4, 2019
Before commencing any work related to the planning and construction of a project under the Dubai Municipality or DM jurisdiction, it is important to first acquire approvals from the Dubai Municipality. DM Dubai provides various approvals for individual, commercial, and Government services, i.e., individuals, businesses, as well as Government bodies need to acquire a permit or approval before commencing any project work in Dubai.
The building department of DM provides approvals for new buildings. Any individual, business, or Government body with a proposed building plan can avail of this service and get DM approvals for their project. The approval can be acquired for either a Structural plan, or Architectural Plan, or both. The various types of projects that are covered under this service include single and multi-story buildings, industrial structures, villas, and floor ratio areas. Before commencing any physical on-site, it is important to get the primary DM approval to make sure the project work is as per the standards and guidelines of Dubai Municipality, otherwise, no physical work should be started. However, Dubai Municipality does not require you to get primary approval, instead, you can directly apply for final approval.
To make sure you get the approval easily, you must follow the given procedure:
This service is provided by the Survey Department of DM and provides various sub-services like Land Boundary information, zoning regulations, approved number of floors, use of land, land area, setback area, owner of the title, etc. The most important benefit of this service is that it does not take a long duration of time, i.e., in case of renewal of villas, you can get the approval within 15 minutes, and the rest of the services take only 1 working day.
To ensure a smooth procedure for this approval, follow the given instructions:
There are several other approvals provided by the Dubai Municipality authority, which can be availed from the official website of DM or various DM-approved offline centers. The Dubai Municipality approvals process can be very easy, but understanding the nature of your project and then submitting the application for the service can be very complex. If you are also looking forward to getting DM Approval, then do not worry and leave all the difficulties and complexities to us. Our experts at Dubai Approvals Team will help you step by step so that you can get your Dubai Approvals on time without any hassle.
We also help you get approvals from various other authorities like Trakhees, DEWA, NAKHEEL, DSO, JAFZA, Food Control Department, EMAAR, RTA, TECOM, and DCCA, and Warehouse approvals. So, Contact Us, save your precious time, and start working on your dreams right away.
May 4, 2019
Dubai is one of the countries that has been recording immense development over the years. Many industries have been coming up yearly, creating a big job market for many Dubai people,e thus the growth of the economy of Dubai. With this immense economic growth, there arose a need to have a body that would oversee the management of infrastructure. The rapid growth of buildings and other infrastructure requires strict guidelines to ensure that quality is not compromised. For this reason, Trakhees regulations and standards were then created in 2009, with the main intent of guaranteeing the development of very sustainable and environmentally friendly structures.
Trakhees is in charge of various entities such as lands, port areas, Dubai World, and other areas within its mandate. Additionally, Trakhees is also responsible for the issuance of business licenses and approvals in the development of certain areas in Dubai. Trakhees is comprised of four sections that all ensure quality and efficiency are maintained in infrastructural development. These sections include the Environment, Health and Safety Department, Commercial Licensing Department, Civil Engineering Department, and Corporate Excellence Department.
Adherence to these rules is a must if you are looking forward to getting Trakhees' approval. Other than the mentioned rules, you must also observe the space area, various business facilities are accorded different floor coverings. Even after getting Trakhees' approval for your business, that’s not all; you still need to ensure that you continue complying with these rules day in and day out. Trakhees online will help you understand these rules and regulations in a better way.
Dubai Approvals Team can help you get Trakhees approval easily without any hassle. Contact us today to know more.
May 4, 2019
In the past couple of decades, Dubai has expanded its industrial and commercial market at a very rapid pace, allowing more opportunities for individuals and businesses. So, it becomes very important for Dubai authorities to manage and maintain a proper set of guidelines in order to maintain quality and safety in all the services. Trakhees has also set up various service codes, wherein every business has to follow certain rules and regulations in its operations.
Trakhees provides five types of licensing services, which include New Licenses, License Amendments, License Renewal, License Cancellation, and Commercial Permit. So, in short, if you want to acquire any type of licensing service,e be it requesting a new license or making changes in your old license, your destination should be Trakhees. \
Let’s discuss the procedure for various licensing approvals of Trakhees:
Procedure for New License:
This type of procedure is used to get a new license, and it applies to those parties who come under the jurisdiction of Trakhees. Here are the steps to apply for a new license:
If you have to make certain changes to your existing license, then you have to follow the steps. It must be noted that the amendments that can be made are changing the Trade Name, changing or adding an Activity, changing in Address or Location, changing or appointing a Manager, increasing Capital, changing the Local Agent, adding or withdrawing a Partner, and changing Legal Type. Also, each type of amendment procedure takes a certain amount of time.
1. In the case of companies under Free-Zone Laws, an applicant has to visit the Trakhees-CLD office and submit the mentioned documents according to the nature of the amendment.
2. Once the applicant is done with all the document submissions, a submission reference number will be generated.
3. The Trakhees-CLD will check all the documents and if all the requirements are fulfilled correctly by the applicant, payment advice will be generated.
4. The applicant can submit the fees online and present the receipt to the front desk offices. The printed license will be available to collect by the applicant.
There are various other options for licenses from Trakhees Approval for companies under Federal Law, General Partnerships, and Simple Limited Partnerships. You can Contact Us and let our experts help you with all your license-related services.
You can see the requirement for Trakhess approval here
Read also: List of all the Approvals Provided by Dubai Municipality
May 4, 2019
With the rapid development in Dubai, it was important for the government to come up with an authority that would be responsible for supervising the infrastructure. In 2009, Trakhees – Department of Planning and Development was introduced in Dubai, and since the,n it has been providing various public services. Trakhees manages all the lands, complexes & areas owned by Ports, Customs & Free Zone Corporations, Dubai World, in the areas defined by PCFC, and its jurisdiction. Trakhees is also responsible for providing business licenses in special development zones and areas.
Trakhees consists of four major departments which include the Corporate Excellence Department, Commercial Licensing Department, Environment, Health and Safety (EHS) Department, and Civil Engineering Department. Each of these departments is working through creativity and excellence so as to provide quality rich services.
Now, if you are looking forward to getting Trakhees approval, depending on your business (be it an eatery, hotel, any food-related activity, or any health-related activity), you have to fulfill certain requirements. To not missing out on any formality, these requirements are categorized.
Requirements to Get Trakhee's Approval
Let’s discuss the various requirements to obtain Trakhee's Approval:
Regulatory Requirements:
General Conditions:
Floor Area Requirements:
Activity | Minimum Net Area (sq. ft) | Activity | Minimum Net Area (sq. ft) |
Salon | 400 | Restaurant | 1000 |
Gym | 1500 | Cafeteria | 500 |
Spa | 1000 | Coffee Shop | 400 |
Pet Shop | 1000 | Grocery | 130 |
Pharmacy | 500 | Department Store | 7000 |
Private Clinic | 700 | Supermarket | 2000 |
Pet Salon | 500 | Restaurant with Shisha | 1500 |
Veterinary Clinic | 750 | Kiosk | 60-100 |
Hotel Commissary | 2500 | Coffee Shop with Shisha | 1500 |
Catering | 700 | Fruit Seller In Supermarket | 250 |
Other Shops | 500 | Fruit Seller – Stand Alone | 500 |
Apart from area requirements, it is important to take care of facility requirements to ensure safety and standards. They are as:
As mentioned above, you must comply with various rules and regulations so that you can get approvals from Trakhees. Even if you get the approval for your business, you still have to maintain quality and standard as per the rules and regulations of Trakhees so that you can retain your license. This is because all the authorities of Dubai are very strict when it comes to the safety and security of infrastructure and the environment. So, if you are also looking forward to getting Trakhees approval or any other authority of Dubai, you must comply with the rules and regulations set by the Government of Dubai.
Furthermore, you can also check our Dubai Approvals services and let our team help you with your approvals. Our experts will guide you step by step so that you can easily get your job done without any hindrance.
May 4, 2019
The Dubai Municipality has come a long way since its establishment on February 28th, 1957, by the first decree. It provides Dubai Municipal Approval and other services to the population of Dubai and its work includes urban planning, construction supervision, environmental protection and improvement, public parks conservation, regulating and ensuring international quality standards compliance in aspects such as
Having begun with just 3 operating employees, it has grown into an organization having more than 15,000 staff working in 32 organizational units, making it a major driving force in the development of Dubai City. With a vision of “Developing a happy and sustainable city,” the DM Approval is also instrumental in maintaining the architectural heritage of the emirate through the revival and maintenance of many cultural landmarks.
The services offered by these sectors are segregated into individual, government, and business-centric, with the focus of DM Approval quality control on areas such as Environment and waste, Financial and business, building and land planning, lab testing and accreditation, Public health and consumer safety, drainage and irrigation, veterinary, agriculture and public markets services.
The Dubai Municipality, or DM, has a planning division that allows streamlined submissions to be made from the user end and a legislative system in place to demarcate its jurisdiction. One example of planning assistance is guidelines for submission of a Masterplan for building plan proposals. Here, the applicant submits a draft proposal for preliminary assessment that covers ownership, on-site, and surrounding region description. Following this, a final assessment submission requires Non-Objection Certificates from the concerned local authorities (Dubai Police, Civil Aviation, Road Transport Authority, Dubai Electricity and Water Authority, etc). Finally, the DM Approval provides a “sign-off sheet” to all service authorities for their approval of the master plan.
After completing all these procedures, a follow-up application needs to be filed online at www.dm.gov.ae which consists of paying the application fee as well. A tutorial for filing this online application is available here.
The year 2011 was a dramatic one for the DM. This was primarily due to the disconnection of utility services to many residential, industrial, and commercial buildings as a result of illegal modifications, partitions, and additions that were made. Warning notices were first sent, following which heavy fines were levied to discourage non-compliance. Repeated offenses meant that utility services to the offenders were cut off by the Dubai Electricity and Water Authority (DEWA). Sometimes unauthorized changes to buildings also run the risk of a lack of fire exits or basic health requirements, and ambiance quality like lighting and ventilation. Once the corrective action was taken, the services were restored to these locations.
If you are looking for Dubai Municipality Approvals, you can Contact Us.
Also, read the Dubai Municipality (DM) approval process in Dubai.
May 4, 2019
Warehouses are required to abide by certain Building Regulations and Design Guidelines to get a license and Dubai Approvals for both establishments and any subsequent Fit-out modifications done to them. The relevant Dubai Approvals for warehouse mezzanines are demarcated by various jurisdictions under different Dubai authorities. Warehouses located in Al Quoz, Dubai Investment Parks, and Ras Al Khor come under the jurisdiction of the Dubai Municipality and Dubai Civil Defence whereas, the Jebel Ali Free Economic Zone - JAFZA is required to get a Trakhees Approval.
Let’s have a look at the general guidelines:
1 parking space per 50 square meters of office space to be provided. For vehicles such as buses, parking space provided depends on the operations carried out and the number of workers. Parking provision for visitors is 10% of the space provided for the staff.
A mezzanine floor is simply an intermediate floor space provided above the warehouse floor. Its function may pertain to the space below or above it.
Any Fit-out / Modifications that are made to existing warehouse structures require an inspection by the Trakhees authorities to obtain a Fit-out/Modification completion certificate.
Also, read Trakhees EHS approval in Dubai
April 17, 2025
Whether you're opening a retail store or building your dream home in Dubai, securing Dubai Municipality approval is the first and most crucial step. But here's the catch: not all approvals are created equal. Commercial and residential projects follow different rules, timelines, and documentation. If you're not sure where your project fits, you're not alone. Missteps can lead to costly delays, legal troubles, or even rejected plans. This guide has everything you need to know, so you can confidently proceed with the approval process, avoid common mistakes, and move your project forward without stress.
What Is Dubai Municipality Approval?
Dubai Municipality approval is an official permit given by the city’s regulatory authority to proceed with construction, renovation, or design projects. Whether it's a towering commercial skyscraper or a cozy villa, every property development must align with Dubai’s building codes and urban planning standards.
This approval make sure safety, compliance, and proper use of land. It covers everything from building permits in Dubai to interior layout approvals and structural modifications. Without this step, your project can't legally start. It’s the backbone of urban development, keeping Dubai’s skyline both stunning and structurally sound.
Overview: Commercial vs. Residential Properties
The first step in determining what kind of Dubai Municipality approval you need is identifying the type of property you’re working on. Here's how they differ:
Dubai has strict zoning regulations, and using a property outside of its designated zone can halt your project. Each type comes with unique application procedures and documentation for Dubai Municipality approvals. Knowing your category early prevents costly rework and delays.
Dubai Municipality Approval Process for Commercial vs Residential
For Commercial Properties
Documents Needed: Architectural drawings, site plans, tenancy contract, trade license, and NOC from the building owner or management.
Approval Steps:
Timeline: 2–4 weeks, depending on complexity.
For Residential Properties,
Documents Needed: Floor plans, site plan, NOC from developer or owner’s association (for apartments).
Approval Steps:
Timeline: Typically 1–2 weeks.
Using a registered consultant simplifies the Dubai Municipality approval process, reducing errors and saving time.
Required Documents: A Side-by-Side Comparison
Here’s a helpful comparison to quickly understand what each property type needs:
Requirement |
Commercial |
Residential |
Architectural Drawings |
✅ |
✅ |
Site Plan |
✅ |
✅ |
Tenancy Contract |
✅ |
✅ |
Trade License |
✅ |
❌ |
NOC from Owner/Association |
✅ |
✅ |
DM-Approved Consultant Needed |
✅ |
Recommended |
Looking for a full document checklist? Check out our detailed guide on the required documents for Dubai Municipality approval.
Mistakes to Avoid When Applying
Proper planning is the secret to fast Dubai Municipality approval.
Getting your Dubai Municipality approval is not difficult if you know what to do. Whether you're launching a new store or renovating your home, understanding the key differences in process, cost, and documents for commercial vs. residential projects is essential.
Contact our team today to help you get any authority approvals in Dubai the right wayquickly, legally, and stress-free.